🛣️ Seattle Hill Road Preservation (City of Mill Creek):
🛣️ 西雅图希尔路保护项目 (Mill Creek市):
Conducted full geometric intersection layout, signage designs, and ADA ramps. Designed construction traffic control and pedestrian detour plans.
完成全套交叉口几何布局、交通标志设计及 ADA 坡道设计。制定施工交通控制及行人绕行方案。
📐 Chain Lake Road Phase 2A (City of Monroe):
📐 锁链湖路 2A 阶段 (Monroe市):
Determined horizontal/vertical alignments and drainage hydraulics; constructed detailed Civil 3D models for earthwork quantifications, plan sets, and cross-sections.
确定平纵线形及排水水力计算;建立 Civil 3D 模型用于土方量计算、出图及横断面分析。
🚌 Denny Way/Westlake Bus Zone Expansion (Seattle):
🚌 丹尼路/威斯特莱克公交站台扩建 (西雅图):
Completed field inspections, drafted ADA-compliant raised crosswalk stops per SDOT regulations, and managed design review interfacings with utilities and environmental units.
现场安全与质量检查,按照 SDOT 标准设计符合 ADA 要求的抬高式人行横道公交站台,并与公用事业和环境部门协调设计审查。